- 2012 Updates to ITU-T Recommendations for Telecom Equipment and SPDs
- An Overview of ATIS STEP Standards Work
- Case Studies of Electrical Protection in the Field
- Case Studies of Electrical Protection Issues in the Field
- Choking the Life Out of Surge: Part 3 of a Practical Approach to Coordination
- Distinguished Lecturer Program: Surge Protection 101 - Part 2
- Electrical Protection Issues and AC Power in the Home
- Fiber-to-the-Antenna: Benefits and Protection Requirements
- Ground Field Studies and Practical Examples
- Ground or Not to Ground Ethernet Protection, Part 2
- Measured Surge Activity at Cellular Sites
- National Electrical Code Update
- National Electrical Safety Code Update
- Noise in the Wind
- Optical Network Terminations: Lightning Damage and Standards - What’s the Latest Information?
- Outside Plant Access Network Testing
- Power GPR-Related Telecom Equipment Damages—Case Studies
- Powering-Protecting-Connecting The Last Frontier: Home Automation/Integration/AV Systems
- Semi-Conductor Protection Devices (Generic and Specific)
- Surge Protection – Safety Requirements for Surge Protectors and Grounding at the Customer Premises
- Things You May Not Have Heard About Lightning and Grounding
- To Fuse or Not to Fuse? That is the Question: Codes, Science, and Case Studies to Support the Unfused Battery Bus in 48 Volt Dc Power Plants